For the lifting and transfer of wide flange beam sections and plate girders.
NOTE: Control the beam at all times. Beams should be gripped as near the center as possible. Snubbing lines at each end must be used to control excessive twisting or swinging, and to guide the beam to its proper place. Each lifting situation may have a specific demand which should be addressed before lifting.
*Design factor based on EN 13155 and ASME B30.20.