In coal-fired power plants, numerous pipes run throughout the facility to generate electricity—such as main steam pipes that deliver high-temperature, high-pressure steam to the turbine, and feedwater pipes that return water from the condenser to the boiler.
At a power plant in Indonesia, Radiolink Plus was used to measure the load of a cylinder that forms part of the piping during maintenance work. Accurate load measurement was essential to ensure safe and efficient crane operations in the plant’s limited space.
Radiolink Plus allows wireless, real-time measurement from up to 1,000 meters when using the Handheld Plus, or up to 100 meters with the dedicated app. This capability was highly valued by the maintenance team, enabling them to complete the work safely and successfully.
Crosby G-2130 Bolt Type Shackles were installed between the crane hook and the synthetic sling, positioned above and below the Radiolink Plus to support load measurement. These shackles, featuring high corrosion resistance thanks to zinc plating and having passed rigorous fatigue tests, are ideal for coal-fired power plants where steam-induced corrosion and vibration fatigue are concerns.
Furthermore, with an industry-leading safety factor of 6:1, they ensure secure lifting of heavy cylinders. Combining reliability and safety, Crosby products provide peace of mind even in the most demanding environments.
Products Used:
Crosby Straightpoint Radiolink Plus (RLP)
Crosby G-2130 / S-2130 Bolt Type Anchor Shackles